PMs tab

The PMs tab has the PM Group section.

image7

Field descriptions

Read-only field: §

Field Definition

Component

PM Level’s component code

Component Description §

PM Level’s component description

PM Type

Identifies the PM Level’s component code schedule type

Options are:

  • Dependent

    These are maintenance levels where each higher level contains the previous lower level. For example: A PM Level B service would also include a PM Level A service at the same time.

  • Independent

    These maintenance levels can be performed at any given time and do not include additional service. For example: a DOT inspections or a state inspections would be independent PMs.

Dependent Rank

A numeric value that represents the order in which the system processes Dependent PM Levels

Inspection Type

Identifies the inspection type required

Note: Independent PMs may be assigned an inspection type. Inspection Tickets must be present with Unit Type assignments.