Assigning primary and secondary trailers automatically

By default, when you assign a trailer to a driver in the Card Planner or Planning Worksheet, any secondary trailer linked to it is ignored. If you want, you can set up the system to assign the linked secondary along with the primary trailer automatically.

To do this, you must: