2020.1 SP3

Resolved issue

Card Planner

  • FS-201969
    When you assigned an order to a trailer, the volume in the second tank was removed. This happened when a forecasted order had the same product in multiple tanks.

  • FS-201993
    Attempting to assign a Job order in Card Planner resulted in a system error.